Port of Pasaia Plan:
Fishing Port:
- Terms and conditions for taking part in the first sale or auction of fresh fish.
- Terms and conditions for operating as a fresh fish wholesaler.
- Terms and conditions for operating as a fresh fish retailer.
- XIIth Chapter Regulations Modification. SPANISH.
Recreational sailing:
- Mooring posts waiting list
- Regulations for the allocations of berths.
- Registering new users. SPANISH.
- Regulation of use of careening area in Donibane quay
Docks and Port areas:
- Entry, transit, layover and health and safety measures information. SPANISH.
- BOG 2018-01-12 Texto Refundido art. 13. ENGLISH.
-
Public Procurement
-
Annual Reports:
- Annual Report 2018. Complete.
Annual Report Pasaia Port 2016 (by chapters).
- Annual Report Pasaia Port 2018. Chap 1
- Annual Report Pasaia Port 2018. Chap 2
- Annual Report Pasaia Port 2018. Chap 3
- Annual Report Pasaia Port 2018. Chap 4
- Annual Report Pasaia Port 2018. Chap 5
- Annual Report Pasaia Port 2018. Chap 6
- Annual Report Pasaia Port 2018. Chap 7
- Annual Report Pasaia Port 2018. Chap 8
Fees and charges:
Port Regulations:
- Particular Requirements for providing the port service of mooring and unmooring ships in Pasaia port. SPANISH.
- Particular Requirements for providing the port service of receiving liquid waste in Pasaia Port.SPANISH.
- Particular Requirements for providing the port service of receiving solid waste in Pasaia Port. SPANISH.
- Particular Requirements for providing the pilotage port service in Pasaia port. SPANISH.
- Particular Requirements for providing the towing port service in Pasaia port. SPANISH.
Plan for the usage of port space:
Educational Visits: Visitors application form:
Current Directors of the Pasaia Port Authority:
Strategic Plan of Pasaia Port:
- Strategic Plan for the port of Pasaia 2015-2025. Strategic Analysis. SPANISH.
- Strategic Plan for the port of Pasaia 2015-2025. Action Plan. SPANISH.
Special Plan for the Pasaia Port Service Area:
- 0_Pasaia Port: Home.
- 1_Pasaia Port: Report.
- 2_Pasaia Port: Specifications
- 3_Pasaia Port: Economic Research
- 4_Pasaia Port: Plans.
- I.01 SITU
- I.02 ORTOPHOTO-CURRENT STATE
- I.03 PLANNING
- I.04 ZONING
- I.05 AVIGATION EASEMENTS
- II.01 MASTER PLAN
- II.02 DIVISION OF AREAS
- II.03 COASTAL BOUNDARIES
- II.3.1 ONDARTXO LAND-USE PLANNING
- II.3.2 OUT_OF_LAND-USE PLANNING
- II.3.3 COASTS
- II.4.1 FISHERIES LAND-USE PLANNING
- II.4.2 OUT_OF_LAND-USE PLANNING
- II.4.3 COASTS
- II.5.1 LA HERRERA LAND-USE PLANNING
- II.5.2 OUT_OF_LAND-USE PLANNING
- II.5.3 COASTS
- II.6a.1 ANTXO LAND-USE PLANNING
- II.6a.2 OUT_OF_LAND-USE PLANNING
- II.6a.3 COASTS
- II.6b.1 ANTXO LAND-USE PLANNING
- II.6b.2 OUT_OF_LAND-USE PLANNING
- II.6b.3 COASTS
- II.6c.1 ANTXO LAND-USE PLANNING
- II.6c.2 OUT_OF_LAND-USE PLANNING
- II.6c.3 COASTS
- II.7.1 RIVERSIDE LAND-USE PLANNING
- II.7.2 OUT_OF_LAND-USE PLANNING
- II.7.3 COASTS
- II.8.1 LEZO LAND-USE PLANNING
- II.8.2 OUT_OF_LAND-USE PLANNING
- II.8.3 COASTS
- II.9.1 SHIPYARD LAND-USE PLANNING
- II.9.2 OUT_OF_LAND-USE PLANNING
- II.9.3 COASTS
- II.10.1 ENTRANCE LAND-USE PLANNING
- II.10.2 COASTS
- 5_Pasaia Port: Environmental Study
- 6_Pasaia Port: Executive Summary
Public Procurement:
Connections:
- Pasaia Rail Network 2016 (RFPP). SPANISH
- Internal Pasaia Port Rail Network Regulation (RCPP). SPANISH
Social Commitment:
Social Commitment: Health and Safety
- PI_ITS_001_Ber2. BASQUE
- PI_ZAI_001_Ber2. BASQUE
- PI_ZAI_002_Ber1. BASQUE
- Pasaia Port Security Plan. BASQUE
Occupational risk Prevention Policy
Hizkuntzen Kudeaketa Eraginkorra:
- DHK-DGL-001-Ber01. Hizkuntza Politika - Política Lingüística.
- PHK-PGL-000-Ber 01. HKS Eskuliburua- Manual SGL.
- PHK-PGL-001-Imagen y Comunicación-Irudia eta Komunikazioa.
- PHK-PGL-002-Relaciones Externas-Kanpo harremanak
- PHK-PGL-003-Relaciones Internas-Barne harremanak
- PHK-PGL-004-Competencias Euskara- Euskara gaitasuna.
Environmental Commitment:
Introduction:
Water quality:
Air quality:
Economic Commitment: